Productivity improvement Trainee

This job is no longer active!

View all jobs VALEO LIGHTING INJECTION active


View all jobs Productivity improvement Trainee active on Hipo.ro

View all jobs Engineering active on Hipo.ro

View all jobs Production active on Hipo.ro


Employer: VALEO LIGHTING INJECTION
Domain:
  • Engineering
  • Production
  • Job type: full-time
    Job level: Student/Graduate
    Location:
  • Timisoara
  • Updated at: 20.11.2017
    Short company description

    Valeo Timisoara face parte din grupul Lighting Systems si a început productia de sisteme de iluminat in septembrie 2005, in crestere anuala, cu aproximativ 2000 de angajati in prezent.

    Productia este impartita in trei unitati: Aftermarket - piata de service (AFM), Produse Speciale (SP) si Echipamente Originale (OEM). In locatia din Timis, producem sisteme de iluminare fata si spate, care lucreaza cu cele mai recente tehnologii si folosesc procese complexe de injectare, acoperire, lacuire, metalizare si asamblare.

    In februarie 2018 a fost lansat proiectul pentru clientul Mercedes, intr-un nou modul de productie, utilizand tehnologii si echipamente de ultima generatie in procesul de injectie mase plastice si cel de asamblare a farurilor (Engel, Krauss-Maffei and IMV - prototip pentru procesul de lacuire dezvoltat pentru Valeo).

    Daca sunteti un candidat puternic motivat, caruia sa ii faca placere sa lucreze intr-un mediu dinamic, in continua crestere, cu tehnologii de ultima generatie, asteptam aplicatia dvs.!

    Accepta provocarea Valeo!

    Requirements

    - University degree (Technical degree is a plus);
    - Fluent in English;
    - Strong Excel abilities.

    Responsibilities

    - Record each productivity idea through a computerized follow-up sheet recording: the amount saved, the name of the pilot, the realization time and the schedule to complete the actions linked with this productivity;
    - Benchmark the site’s performance by consulting the productivity sheets of the other plants located in the same area or with the same activity;
    - Organize new productivity detection and action progress follow-up committees, on a monthly or a weekly basis, by productivity category (material, direct labor, overheads, logistics), with the relevant participants;
    - Make sure that the half yearly savings objectives by category are included in the budget and their achievement.

    Other info

    Benefits:
    Professional Development Opportunities;
    International Work Environment & Mobility Opportunities;
    Competitive Salaries based on performance, 13th salary;
    Meal tickets;
    Health & Wellness (Private Health and Life Insurance, Sport activities etc.);
    Free transport from Timisoara.